Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Fling Study
- We are now 40/42
- GEOSYS had a power outage yesterday -- running scenarios terminated
- Running 118 and 124 on HPCC, using trunk and updated parallel scripts
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Finished running URS full validation test
- trunk and 11.2.3 results match on broadband.usc.edu
- Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
- Scenario 104 ran in 36 hours, (versus 60 hours previously).
- Still some room for improvement, by staging in data (maybe worth for longer scenarios)
- John Yu installed Cruise Control
Today:
- Fling Study
- Monitoring running scenarios
- Package new running scripts and check them into svn as part of BBP
- Continue working on the testing framework
- Plan separation of GF, validation data, and velocity models
- Work on Cruise Control setup
Blocked:
- No
Followups:
- Meeting with Phil to talk about Broadband development priorities @ TBD
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events and codebases from each other