Staff Priorities - Fabio

From SCECpedia
Revision as of 16:51, 19 September 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Tested the new gen_plots and gp_gof modules
  • Added arias duration plot to the gen_plots module
  • Exchanged e-mails with RG about changing the simulation run time
  • e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios

Today:

  • Test Arias Duration implementation, check code into svn
  • Try running jbsim with different simulation windows
  • Call with RK, PM
  • Work on BBToolbox integration

Blocked:

  • No

Followups:

  • Cybershake call @ 11am
  • RK, PM call @ 1:30pm