Staff Priorities - Fabio

From SCECpedia
Revision as of 16:44, 24 September 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Ran 1-station 8.2 fling with 100s and 150s windows
    • RG suggested going out to 200s-250s window in this case
  • Reviewed 50-realization GP LOMAP results
    • Simulation script worked well, plots useful
  • Reviewed output files of BBToolbox that Rumi provided

Today:

  • BBToolbox integration
  • Add error checking to HPCC validation script
    • Check code into svn
  • Broadband discussion with JY
  • Call with UCSB about cluster/server results

Blocked:

  • No

Followups:

  • Broadband discussion with JY, PM @11am
  • UCSB Cluster versus Server differences with PM, JC, RA(?) @ 2pm