Staff Priorities - Masha

From SCECpedia
Revision as of 18:15, 6 February 2013 by Liukis (talk | contribs)
Jump to navigationJump to search

Current Activities

Yesterday

  • CSEP status meeting at 9am, posted minutes
  • Danijel missed the status meeting, called to catch up
    • Danijel sent out suggestion to drop STEP Matlab
    • Add RELM Mainshock models to USGS forecasts evaluation
    • Retrospective testing of USGS forecasts: 5-year and 7-year period since 2006/01/01
  • csep-op:
    • Catching up with CA one-day forecasts
    • ANSS catalog was not available through FTP, contacted ANSS
  • Trac ticket #302 Develop interactive results viewer application
    • Met with John to set up VM image with generic CSEP installation
  • Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
    • Acceptance test is failing on csep-cert
  • Trac ticket #249 Diagnostics tests should support empty observation catalog
    • Acceptance test fail with newer R codes by Robert
  • Met with John:
    • Network cable problems
    • csep-op hardware upgrade

Today

CSEP

  • csep-op:
    • Re-processing due to expired Matlab licence
  • Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
    • Acceptance test is failing on csep-cert
  • Trac ticket #249 Diagnostics tests should support empty observation catalog
    • Acceptance test fail with newer R codes by Robert
  • Open Trac tickets:
    • 303 Process Global experiments for 2012/12: 8-17 due to network issues on csep-op server
    • 295 Diagnostics tests should be applied to time-dependent forecasts

Blocked: None

Followups: None

Responsiblities