Staff Priorities - Masha
From SCECpedia
Jump to navigationJump to searchCurrent Activities
Yesterday
- CSEP status meeting at 9am, posted minutes
- Danijel missed the status meeting, called to catch up
- Danijel sent out suggestion to drop STEP Matlab
- Add RELM Mainshock models to USGS forecasts evaluation
- Retrospective testing of USGS forecasts: 5-year and 7-year period since 2006/01/01
- csep-op:
- Catching up with CA one-day forecasts
- ANSS catalog was not available through FTP, contacted ANSS
- Trac ticket #302 Develop interactive results viewer application
- Met with John to set up VM image with generic CSEP installation
- Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
- Acceptance test is failing on csep-cert
- Trac ticket #249 Diagnostics tests should support empty observation catalog
- Acceptance test fail with newer R codes by Robert
- Met with John:
- Network cable problems
- csep-op hardware upgrade
Today
CSEP
- csep-op:
- Re-processing due to expired Matlab licence
- Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
- Acceptance test is failing on csep-cert
- Trac ticket #249 Diagnostics tests should support empty observation catalog
- Acceptance test fail with newer R codes by Robert
- Open Trac tickets:
- 303 Process Global experiments for 2012/12: 8-17 due to network issues on csep-op server
- 295 Diagnostics tests should be applied to time-dependent forecasts
Blocked: None
Followups: None