Staff Priorities - Phil

From SCECpedia
Revision as of 18:00, 10 January 2014 by Maechlin (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Check on M8 seismograms
  • UCVM Abstract Review
  • DC Practice
  • Updated JY profile
  • Confirm ED/GJ Meeting (Jan 16)
  • Sent Image to OLCF
  • Schedule Po visit (Feb 10)

Today:

  • BBP Pub plan call scheduled (Fri 830am)
  • YC storage call (11:30am)
  • DOE INCITE 2013 Final Report
  • SCEC social media feedback
  • BBP Call (2pm)

Blocked:

  • No

Followups:

  • No

Pending:

  • UCVM meeting ()
  • CSEP Meeting ()
  • UCERF Meeting ()
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file