Staff Priorities - Phil

From SCECpedia
Revision as of 17:33, 21 January 2014 by Maechlin (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Submitted 15 SCEC proposal reviews
  • Sent in updated CUG BW Abstract
  • Sent in EC Project proposal

Today:

  • Check on BBP Storage Status
  • DOE INCITE 2013 Final Report
  • SCEC social media feedback
  • 1D model for CyberShake
  • Review CyberShake model

Blocked:

  • No

Followups:

  • No

Pending:

  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file