Staff Priorities - Phil

From SCECpedia
Revision as of 17:45, 31 January 2014 by Maechlin (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • DOE INCITE 2013 Final Report w/ GE
  • DOE INCITE 2013 Final Report w/ PC
  • BBP 1D model follow-up with DG
  • Coordinate EC Call with ED
  • Review SRR from SC
    • Requests: add CVM-H GTL Maps w/ test stations
    • Requests: add 1D plots w/ 1km transition to Moho

Today:

  • Review TRR
  • Review TRR from SC
  • EC Call with ED
  • Update EC prospectus
  • PC feedback
  • Send out Geo/SI2 Call Announce
  • TTI one pager

Blocked:

  • No

Followups:

  • Nvidia meeting at 1:30pm

Pending:

  • Confirm SI2 meeting
  • CS parallelism discussion with SC
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file