ERI Workshop ToDo
From SCECpedia
Contents
Exercise Run-Time Estimates
============ NR 5 stations =============
GP : 65m23.223s SDSU : 79m39.141s UCSB : 14m13.546s
Update Images
- Add Sac Manual
- Add basement and moho turf files to image
- Add bbp2sac utility to Image
Produce horizontal slices with corners
- -121.0 32.0
- -114.0 36.0
- Horizontal slices from CVM-H at depths
- 0km
- 2.5km
- 5km
- 10km
- 20km
- 30km
Produce vertical cross sections
- 0m to 30000m would be ok.
- Resolution is 500m horizontal, 100m vertical.
- S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts.
- -118.45 33.8
- -118.45 34.6
- SW-NE: across center of LA basin into S.Gabriel Mts.
- -118.5 33.6
- -117.8 34.2
Produce Vertical Profiles from sealevel to 30km
- center of LA basin: 389202.929688 m, 3757530.875 m
- -118.19907888893411
- 33.95244598417918
- San Fernando basin: 366000 m, 3788000 m
- -118.45481546476057
- 34.22445042062638
- western San Gabriel Mts.: 386677.617188 m, 3791082.85938 m
- -118.23077628184646
- 34.25470454725538
- Updated version of Virtual Box
Preparation and Documentation Tasks
- time runs using windows image and post results
- instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?).
- Surface Plugin with image draped over topography
- Horizontal slices with negative depths
SCEC-VDO Workshop Tasks Monday Sept 15
- Check query by depth versus query by elevation
- Add GTL on or off option
- Confirm UTM conversion issue in SCEC-VDO