Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday
- Modified Anderson GoF Code
- Made it a BBP module
- Uses BBP directory structure, outputs plots in outdata
- Call with AS
- Complete results for all bands (some differences)
- Handed off updated code, waiting for feedback
- E-mail with KO and RT regarding BBToolbox update
- Code tweaks to adjust to nga 1/2 models -- need further clarification
Today
- Check with KM, CG regarding NGA-West 2 validation
- List of scenarios
- Write script to validate scenarios from spreadsheet
- Software lab EEW machine setup
Blocked:
- No
Followups:
- High-F call @ 11am
- Task priorities with PM (TBD)
To Do:
Short Term
Broadband Platform
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method