Staff Priorities - Kevin

From SCECpedia
Revision as of 17:07, 3 August 2015 by Kmilner (talk | contribs)
Jump to navigationJump to search

8/3/15

Yesterday:

  • did spectral analysis on UCERF3-TD based synthetic catalogs
  • helped Ned speed up ETAS diagnostics code by ignoring contribution below a fractional threshold
  • finished directivity model validation and regenerated CyberShake-OEF maps

Today:

  • pick AGU session and write first draft of abstract, send to Tom
  • run simulator synchronization analysis on UCERF3-TD catalog
    • will require code rewrites to make synch code more general, get UCERF3 data into format which will work for simulators

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)