Yesterday

  • SCEC Lunch
  • Waiting for JB results
    • All LOMAP simulations completed
    • All Landers simulations completed
      • GP only 42 realizations
      • Resubmitted GP Landers
    • Notified JB results available
  • Posted GP site response module with bssa2014 model
    • Notified RG
  • Finalized integration of RZZ2015 and AS2016 metrics
    • Tested code for ExSIM, GP
  • Received 3D Hercules results
    • Downloaded files from BW

Today

  • Call with PM, TH about GIT setup
  • Monitor GP run on HPCC
  • Start GMSV slides
  • Process Hercules results
  • Continue work on BBP gauntlets
    • Run codes with UCSB, SDSU, other Part-A events
    • Test codes with Part-B events

Blocked:

  • No

Followups:

  • PM, TH @ 10:30 GIT Setup

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon