Yesterday:
- responded to CyberShake disaggregation/hazard curve calculation questions from Nenad
- ETAS work
- got scenario simulation plots working
- discovered issue with ID of scenario rupture, modified code to make scenario rupture always ID 0
- investigated time zone issues - simulations were starting at noon instead of midnight
- verified that input historical earthquake catalog is UTC
- determined that it was daylight savings time issue
- configured more scenario simulations, submitted at Stampede
- responded to question from Rundle's group, generated geometry file with different sorting. They might be asking for something more difficult, but hopefully this satisfies the request.
Today:
- ETAS work:
- fix bug with runs overnight and resubmit
- work on getting all scenario based plots down to M2.5 (currently M4). First try filtering out spontaneous events, might be small enough. Then move to bigger machine if that doesn't work
- babysit runs on stampede and submit more when jobs push through
- continue new opensha transition
- recompile WG02 ERF and set up wrapper
- get coverage tests working
- more followup questions from Nenad on CyberShake curve/disagg calculation
Blocked:
no
Followups:
no
Lower priority or longer term tasks
- once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
- wiki page for web services
- continue to figure out bug with site amplification implementation, fix unit tests