CSEP Minutes 05-23-2018

From SCECpedia
Revision as of 20:01, 23 May 2018 by Wsavran (talk | contribs)
Jump to navigationJump to search

CSEP Working Group Home Page

Participants:

Participants

A. Michael; J. Gilchrist; J. Yu; and M. Werner

Minutes

5 year plan topics we missed last week

* Notes: CSEP does not use Comcat for authoritative data set
* Idea: run comparison to see how much the catalogs change and its effects on the forecasts

CSEP/CISM/Paleoseismology Workshops

* CSEP Workshop funded, hoping for the SCEC annual meeting
* 1 day workshop (wrapping up CSEP1 and planning for CSEP2)
* Need to start thinking about what to address; extended abstracts, etc.
* Hope to present CSEP1 curated data set; hoping for California one-day model evaluations.
* W/r/t to the CISM/Paleoseismology
** Switch to 1 day workshop
** Proposal to split half time on Paleo side and physics-based forecasting side.

Curation of CSEP1 data set

  • Goal: v1.0 of CSEP1 data set by mid-summer.
  • Step 1: Figure out the status of the CSEP system, and make decision based on resources.
  • Important to get 'complete' set of results and publish those.
    • Important to publish the evaluation results, next the forecasts, and catalogs. Think about data management problem.
    • Proposal from Max: Identify missing forecast from one-day model group. Regenerate missing forecasts, and verify the test results and evaluations. Must rebuild trust in the system.
  • Task for Bill: Think carefully about levels of reproducibility of CSEP1 data and what time/effort is required.