CSEP Minutes 05-23-2018

From SCECpedia
Jump to navigationJump to search

CSEP Working Group Home Page

Participants:

Participants

A. Michael; J. Gilchrist; J. Yu; M. Werner; and W. Savran

Minutes

CSEP/CISM/Paleoseismology Workshops

  • CSEP Workshop funded, hoping for the SCEC annual meeting
  • 1 day workshop (wrapping up CSEP1 and planning for CSEP2)
  • Need to start thinking about what to address; extended abstracts, etc.
  • Hope to present CSEP1 curated data set; hoping for California one-day model evaluations.
  • W/r/t to the CISM/Paleoseismology
    • Switch to 1 day workshop
    • Proposal to split half time on Paleo side and physics-based forecasting side.

Curation of CSEP1 data set

  • Goal: v1.0 of CSEP1 data set by mid-summer.
  • Step 1: Figure out the status of the CSEP system, and make decision based on resources.
  • Important to get 'complete' set of results and publish those.
  • Notes: CSEP does not use Comcat for authoritative data set
  • Idea: run comparison to see how much the catalogs change and its effects on the forecasts
    • Important to publish the evaluation results, next the forecasts, and catalogs. Think about data management problem.
    • Proposal from Max: Identify missing forecast from one-day model group. Regenerate missing forecasts, and verify the test results and evaluations. Must rebuild trust in the system.
  • Task for Bill: Think carefully about levels of reproducibility of CSEP1 data and what time/effort is required.