Staff Priorities - Fabio

From SCECpedia
Revision as of 17:10, 6 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

Today:

  • Fling Study
    • Validate all the data from yesterday
  • Wait for Rumi to reply to my questions
  • Back to Python
    • Find a place in the BBP src tree to put the plot files
    • Look for ways to update station list format to include additional parameters

Blocked:

  • No

Followups:

  • Cybershake call at 11am

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other