Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Fling Study
- Finished running Scenarios 116, 132, 133, 134 on HPCC
- Started Scenario 136 (longer)
- John Yu ran Scenarios 105 and 115. Running others right now.
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Investigated SDSU's validation run
- Able to reproduce hyb files from Rumi, sent her e-mail with details
Today:
- Fling Study
- Validate all the data from yesterday
- Wait for Rumi to reply to my questions
- Back to Python
- Find a place in the BBP src tree to put the plot files
- Look for ways to update station list format to include additional parameters
Blocked:
- No
Followups:
- Cybershake call at 11am
Ongoing:
- Make trunk work both with and without site response
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other