Yesterday:

  • Fling Study
  • Running full validation test for URS
    • Comparing trunk and 11.2.3 on broadband.usc.edu
    • LP and LA passed, waiting for NR to finish running
  • Trac #101: Done: Implemented unit test to catch mix of spaces and tabs in Python code
  • Trac #135: Done: Current trunk code fails spaces/tabs mix test
  • Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
    • John's scripts only ran on 1 node
    • Current scripts run on many nodes, but need to capture the output better (fails right now)
    • Testing CopyParallel.py script on HPCC

Today:

  • Fling Study
    • Monitoring running scenarios
  • Continue working on HPCC parallel scripts to run Fling scenarios in half time
  • Continue working on the testing framework
  • Work on Cruise Control setup (pending John Yu install)

Blocked:

  • John Yu: Installing Cruise Control

Followups:

  • Meeting with Phil to talk about Broadband development priorities @ TBD

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other