Staff Priorities - Fabio

From SCECpedia
Revision as of 17:48, 28 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
  • Finished running URS full validation test
    • trunk and 11.2.3 results match on broadband.usc.edu
  • Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
    • Scenario 104 ran in 36 hours, (versus 60 hours previously).
    • Still some room for improvement, by staging in data (maybe worth for longer scenarios)
  • John Yu installed Cruise Control

Today:

  • Fling Study
    • Monitoring running scenarios
  • Package new running scripts and check them into svn as part of BBP
  • Continue working on the testing framework
  • Plan separation of GF, validation data, and velocity models
  • Work on Cruise Control setup

Blocked:

  • No

Followups:

  • Meeting with Phil to talk about Broadband development priorities @ TBD

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other