Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Fling Study
- We are now 40/42
- GEOSYS had a power outage yesterday -- running scenarios terminated
- Running 118 and 124 on HPCC, using trunk and updated parallel scripts
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Trunk fails UCSB Loma Prieta full validation
- This issue is documented in Trac issue #77
- Running UCSB LP full validation with 11.2.3 to confirm results match
- John Yu installed Cruise Control
- Met with Phil to talk about Broadband development
- Discussed recent progress and goals
Today:
- Fling Study
- Monitoring running scenarios
- Package new parallel running scripts and check them into svn as part of BBP
- Fix Trac issue #77 (UCSB LP validation)
- Start sketching BBP workflow (component by component with input and output files)
- Plan separation of GF, validation data, and velocity models
- Work on Cruise Control setup
- BBP Science call
Blocked:
- No
Followups:
- Broadband tasks for next two weeks with Phil @ TBD
- Broadband Science call @ 2pm
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events and codebases from each other