Staff Priorities - Fabio

From SCECpedia
Revision as of 16:21, 2 July 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
  • Ran full validation of UCSB Loma Prieta on both trunk and 11.2.3
    • Extra station in trunk causes (non fatal) error messages, as documented in Trac issue #77
  • John Yu installed Cruise Control
  • Broadband science call
  • Met with Phil to talk about Broadband development for next 2 weeks

Today:

  • Fling Study
    • Monitoring running scenarios
  • Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
  • Fix Trac issue #77 (UCSB LP validation)
  • Continue sketching BBP workflow (component by component with input and output files)
  • Trac issue #82: Start separation of GF and validation data
  • Trac issue #128: Start work on Cruise Control setup

Blocked:

  • No

Followups:

  • No

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events from each other