Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Fling Study - Done.
- Completed 42/42
- Data from scenarios 118 and 124 is good, Tar files generated
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Trac issue #143: Fixed path length issues on URS pipeline
- Fixed several modules, adding length checks to Python code, increasing limit to 256 characters in C/Fortran
- Ran full validation tests for URS-nr, URS-lp, and URS-la
- Trac issue #104: Environment variables select GF and validation directories: done, testing
- Trac issue #82: Separate validation code from Greens Functions: done, testing
Today:
- Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
- Trac #104: Write sample scripts
- Trac #82: Run more acceptance tests
- Trac #84: User selectable Greens Functions
- Continue sketching BBP workflow (component by component with input and output files)
- Trac issue #128: Start work on Cruise Control setup
Blocked:
- No
Followups:
- No
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events from each other