Staff Priorities - Fabio

From SCECpedia
Revision as of 17:00, 8 August 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • All full validation test ran ok
  • Checked in code and created new validation and velocity model packages
  • Met with Phil to discuss LOMAP results
    • Running tests again to make sure we are getting good results
  • Worked on sketching BBP workflow (genslip, jbsim, hfsim, wcc_siteamp)
  • Fix for rupture slip plot breaks some acceptance tests
  • Scheduled cal with Kim and Rumi to discuss BBToolbox updates

Today:

  • Investigate rupture plot issue
  • Work on SCEC meeting abstract
  • Continue sketching BBP workflow (component by component with input and output files)
  • Look into HPCC 50-realization LOMAP script
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
  • Integrate SDSU code v1.4 into Broadband (after call tomorrow)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No

Followups:

  • Cybershake call @ 11am