Staff Priorities - Fabio

From SCECpedia
Revision as of 17:04, 13 August 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Received feedback on SCEC abstract, submitted it
  • Wrote module to handle sub-pipeline for observed seismograms
    • Handles bbp acceleration and peer formatted files
  • Finished sketching BBP GP pipeline
  • Broadband science call
  • Broadband devel meeting with Phil

Today:

  • Finish work on observed seismograms BBP module
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
    • Test new package with trunk
  • HPCC scripts
    • Full validations
    • 50-realization LOMAP script
  • Continue sketching BBP workflow (UCSB and SDSU pipelines)
  • Integrate SDSU code v1.4 into Broadband (after receiving data files)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No (but Broadband.usc.edu is down)

Followups:

  • No