Staff Priorities - Fabio

From SCECpedia
Revision as of 16:47, 21 September 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Tested new version of RotD50 code in the platform
    • Few changes to the Fortran code
  • Ran LOMAP GP and UCSB
    • Results look fine with new RotD50
  • Checked everything into svn
  • Broadband science call
  • Ran 50-realization LOMAP GP on HPCC
  • Call with CG, what else is needed to finalize pipeline
    • Band-pass filter for bias plot
    • Another bias plot with station distance

Today:

  • Run 1-station 8.2 fling
    • 100s window size
    • 150s window size
  • Post 50-realization results
  • BBToolbox integration

Blocked:

  • No

Followups:

  • No