Development targets, Trac Tickets, and other activities related to Broadband Platform development. In these planning, Level of Effort (LOE) is defined in days.
Create BBP v12.10 Distribution
- Confirm SDSU results (cvm used,default kappa value,fault geom file)
- Confirm GP, UCSB, SDSU work on server and HPCC
- Confirm seismogram duration of 100seconds
- Complete data product improvements including (use RotD50 not avg horizontal)
- Compile list of Broadband data products and add to users guide
- Update User Guide
- Update manifest in distribution
- Tag distribution with version number
- Post new distribution files using download tracking
Sprint 7
- Sprint Dates: 24 Sept - 5 Oct
Priority |
Sprint Task |
Estimated LOE |
% Completed |
Vel. Pts
|
1 |
Integration of the new bbtoolbox model |
5 |
80 |
4.0
|
2 |
Modeler access to cluster |
1 |
10 |
0.1
|
3 |
Release candidate distribution for v12.10 |
3 |
10 |
0.3
|
4 |
Match simulation results between server and cluster |
2 |
66 |
1.3
|
5 |
Generate first set of 50 realizations for LOMAP |
2 |
66 |
1.3
|
6 |
Install bbp software usable on server and cluster |
3 |
0 |
0
|
7 |
Data products list generated for validation runs |
2 |
0 |
0
|
8 |
Calculate SI2 BBP Metrics |
1 |
10 |
0.1
|
9 |
BBP input to EXSIM input config generator |
2 |
10 |
0.2
|
10 |
Use low and high frequency limits on bias plots |
2 |
100 |
2
|
11 |
Use RotD50 data on bias plot |
2 |
50 |
1
|
|
Total Sprint Velocity |
19 |
|
10.3
|
Sprint 6
- Sprint Dates: 10 Sept - 21 Sept
Priority |
Sprint Task |
Estimated LOE |
% Completed |
Vel Pts
|
1 |
Implementation of the Arias duration GOF plots |
3 |
100 |
3.00
|
2 |
Integration of new bbtoolbox model |
5 |
30 |
1.50
|
3 |
Develop scripts to run bbp on cluster |
5 |
95 |
4.75
|
|
Total Sprint Velocity |
13 |
|
9.25
|
Sprint 5
- Sprint Dates - 27 August - 7 Sept
- Calculate velocity profiles (Vp,Vs,rho) for all California validation events
- Configure bbp to run on server or cluster
- Add Arias duration into validation pipeline
- Add Site Correction Module into validation pipeline
- End-to-end validation pipeline with both obs and sim processing
- Integrate new bbtoolbox codes into pipeline
- Configure UCSB and SDSU methods to run LOMAP
- Fill out 6 panel bias plots based on 3 methods running on server and cluster
- Install bbp software usable on server and cluster
- Prepare Broadband 12.8.0 Release, including:
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 4
- Sprint Dates - 13 August - 24 August
- Calculate velocity profiles for Landers and Hector Mine station sites
- Configure UCSB and SDSU methods to run LOMAP
- Post bias plots for LOMAP for 3 main methods on server and on cluster
- Add method that raises uncatchable exception to bbp_utils to identify unexpected conditions
- Add arias duration into validation pipeline
- Add rotd50 into validation pipeline
- Check rotd50 results from platform against results from CG
- Add site correction module to process observed seismograms
- Add observation data processing into validation pipeline
- End-to-end validation pipeline with both obs and sim processing.
- Data products list generated for validation runs.
- Make site response processing optional for validation runs
- Update GP codebase with compiler changes
- Prepare Broadband 12.8.0 Release
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 3
- Sprint Dates: 30 July - 10 August
- Routine plotting of LOMAP full validation with comparison acceleration plots (with fixed label), and Bias GOF plots for LOMA Prieta
- LOMAP workflow changed to include rupture generator
- Wiki site updated to contain current input files, current GOF, and example comparison plots
- URS modules renamed to GP
- Documentation on how to setup new GF and validation data
- DB code and PEER formatter included in trunk
- Rupture generator parameters separated into user selectable (), and modeler adjustable (DLEN, DWID, DT)
- ROTD50 running with acceptance test and producing file as part of LOMAP
- ARIAS running with acceptance test and producing file as part of LOMAP
- Integrate new bbtoolbox into platform
Sprint 2
- Sprint Dates: 16 July - 27 July
Priority |
Sprint Task |
Estimated LOE |
% Complete |
Vel. Pts
|
1 |
Change validation processing so users specify GF used in processing |
10 |
100 |
10
|
|
Total Sprint Velocity |
10 |
|
10
|
Sprint 1
- Sprint Dates: 2 July - 13 July
Priority |
Sprint Task |
Estimated LOE |
% Complete |
Vel. Pts
|
1 |
Separate Validation Data from BBP software distribution |
10 |
100 |
10.0
|
|
Total Sprint Velocity |
10 |
|
10.0
|