Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Worked with FW to get CY GMPE fixed (peak T=0.1s)
- Re-generate 30 and 50km SAs from all 4 GMPEs using FW's code
- Parameterized several values in GP and SDSU pipeline
- Many parameters are now configured on a per-velocity model basis
- Ran several GMPE scenarios
- Posted results on wiki
- Sent note to RB and KO with link to test results
Today:
- Generate new BB package for cluster
- Start epicenter runs for GP method (LOMAP, Whittier, NR, GMPEs)
- Create estimate of computation time needed for Dec 11th data products
- Ask Broadband folks for priorities
- Send GMPE runs link to CG, RK, to develop post-processing scripts
- Start 5-station east event using the GP method
Blocked:
- No
Followups:
- Broadband science call @ 2pm