Staff Priorities - Scott

From SCECpedia
Revision as of 18:08, 21 February 2013 by Scottcal (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Blue Waters:
    • Tested post-AWP helper scripts, found bugs, retesting
    • Worked on workflow generation script
    • Validated RWG TEST V3.0.3 SGTs
  • Stampede:
    • Tested PP again with TEST, validated
  • Kraken:
    • Ran post-processing with RWG TEST V3.0.3 SGTs, validated
  • CyberShake calls - updated computational plan
  • Worked with David on setting up remaining runs

Today

  • Blue Waters:
    • Commit AWP helper scripts to SVN
    • Continue testing post-AWP helper scripts
    • Validate AWP WNGC SGTs on Kraken
  • Stampede:
    • Run s351 PP with timing numbers to get performance comparison with Kraken
    • Install and test AWP helper scripts
    • Test AWP SGT generation
  • Kraken:
    • Validate AWP WNGC SGTs
    • Select a rupture for forward simulation
  • Add AWP helper scripts to AWP workflow
  • Produce site list + KML for CS Study 2.3

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration