Staff Priorities - Phil

From SCECpedia
Revision as of 18:01, 3 March 2014 by Maechlin (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • BBP Call
  • PRAC Summary Info

Today:

  • PRAC Proposal Call 2pm
  • PRAC

Blocked:

  • No

Followups:

  • BBP Changes w/ FS

Pending:

  • FW ABF into CME codebase
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file