ERI Workshop ToDo

From SCECpedia
Revision as of 23:06, 25 September 2014 by Maechlin (talk | contribs)
Jump to navigationJump to search

Update Images

Produce horizontal slices with corners

  • -121.0 32.0
  • -114.0 36.0
  • Horizontal slices from CVM-H at depths
    • 0km
    • 2.5km
    • 5km
    • 10km
    • 20km
    • 30km


Produce vertical cross sections

    • 0m to 30000m would be ok. (5km elevation, -35km elevation)
    • Resolution is 500m horizontal, 100m vertical.
  • S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts.
    • -118.45 33.8
    • -118.45 34.6
  • SW-NE: across center of LA basin into S.Gabriel Mts.
    • -118.5 33.6
    • -117.8 34.2


Produce Vertical Profiles from sealevel to 30km

  • center of LA basin: 389202.929688 m, 3757530.875 m
    • -118.19907888893411
    • 33.95244598417918
  • San Fernando basin: 366000 m, 3788000 m
    • -118.45481546476057
    • 34.22445042062638
  • western San Gabriel Mts.: 386677.617188 m, 3791082.85938 m
    • -118.23077628184646
    • 34.25470454725538
  • Updated version of Virtual Box

Exercise Run-Time Estimates

============ 
NR 5 stations
=============
GP   : 65m23.223s 
SDSU : 79m39.141s
UCSB : 14m13.546s


Preparation and Documentation Tasks

  • time runs using windows image and post results
  • instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?).
  • Surface Plugin with image draped over topography
  • Horizontal slices with negative depths

SCEC-VDO Workshop Tasks Monday Sept 15

  • Check query by depth versus query by elevation
  • Add GTL on or off option
  • Confirm UTM conversion issue in SCEC-VDO

Related Entries