Staff Priorities - Fabio

From SCECpedia
Revision as of 17:26, 17 October 2014 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Finalized moving simulation data to Hard Drive
  • Shipped hard drive to JB
  • Patched BBP with SDSU latest update
  • Ran scenarios i through l for all ruptures
    • Last HPCC runs before shutdown
  • Talked to CG about simulation results

Today

  • Post SDSU results, send link to JB, CG for download
  • Create plots for latest SDSU results
  • Post main results on hypocenter for CG download
  • Continue clean-up on hypocenter drive (back after repair)
  • Close trac tickets

Blocked:

  • No

Followups:

  • BBP call at 2pm