Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday
- Finalized moving simulation data to Hard Drive
- Shipped hard drive to JB
- Patched BBP with SDSU latest update
- Ran scenarios i through l for all ruptures
- Last HPCC runs before shutdown
- Talked to CG about simulation results
Today
- Post SDSU results, send link to JB, CG for download
- Create plots for latest SDSU results
- Post main results on hypocenter for CG download
- Continue clean-up on hypocenter drive (back after repair)
- Close trac tickets
Blocked:
- No
Followups:
- BBP call at 2pm