Staff Priorities - Fabio

From SCECpedia
Revision as of 22:14, 5 June 2015 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Another update to OS X Guide
    • Merged some OS X instructions into main User Guide
    • Simplified OS X method 2 description
    • Added links to better direct user
  • Received and activated BW token
  • Talked to AS regarding Anderson GoF
    • Reviewed codebase, provided feedback to AS
  • Mofidied Anderson GoF Code
    • Enabled plotting
    • Format improvements

Today

  • Mofidied Anderson GoF Code
    • Made it a BBP module
    • Remove hard-coded paths and filenames
    • Send code back to AS for continued development

Blocked:

  • No

Followups:

  • Task priorities with PM (TBD)

To Do:

Short Term

Broadband Platform

  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method