Staff Priorities - Fabio

From SCECpedia
Revision as of 16:30, 28 July 2015 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday

  • High-F
    • Generated plots for half space data with filter at 4Hz
    • Sent high-F call announcement
  • Site response module testing
    • Compared data with and without the GP site response module
    • Posted data on web, sent e-mail to FZ
  • Asked JY to set up FZ BBP account so he can run simulations on BBP server
  • BBP Gauntlets
    • Worked on SR Matlab code
    • Received more codes from NL

Today

  • Continue work on RZZ2015
  • Call with SR
  • High-F call
  • SGS code debug
  • Run revised NGA-West 2 testing
  • Try logging into Gordon

Blocked:

  • No

Followups:

  • SR call @ 10am
  • High-F call @ 11am

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method