Staff Priorities - Kevin

From SCECpedia
Revision as of 16:59, 15 October 2015 by Kmilner (talk | contribs)
Jump to navigationJump to search

10/15/15

Yesterday:

  • While profiling running simulations on stampede, found major bug in Ned's latest ETAS code that was causing simulations to hang. Basically a simulation could get stuck in an infinite loop if a rupture below a certain depth was triggered, which is rare but possible when running many simulations.
    • implemented temporary non-ideal fix for current runs
    • Ned working on long term fix
  • plots for latest runs
  • edits to XSEDE proposal

Today:

  • help Ned with fix for EQ depth/infinite loop issue
  • post process/generate plots for 100yr runs which finished, send off to Morgan/Nicholas
  • merge in latest ETAS code from Ned for hopefully final batch of runs prior to Powell Center meeting
  • post process results for scenario ETAS runs yesterday, send to Ned

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
  • finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences