Yesterday

  • Generated plots for new High-F results
    • RWG versus Hercules versus AWP
    • Only close and mid-distance stations
  • Revised SDSU results
    • Contacted KO, RT about new runs
  • Replied to SGS regarding Song RMG results
    • Will run 400m spacing for all Part-A, Part-B events
  • Confirmed AGU presentation

Today

  • Set up Song RMG events on HPCC
  • Respond AECOMM email to software
  • Update bbp converters to filter time series according to RT suggestion
  • Contact RT regarding processing of recorded data
  • Finish Cybersecurity training

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon