Staff Priorities - Fabio

From SCECpedia
Revision as of 23:22, 3 May 2016 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Finalized tests of Anderson GOF
    • Code checked into svn
  • Created super tables for events
    • Copied data out of HPCC before shutdown
  • Re-ran Song and SDSU using new GFs
    • Same results
  • Created BBP 16.5 RC1 distribution
    • GFs and validation packages
    • Updated wiki
    • Updated User's Manual
    • Updated Installation Guide
      • Mac OS X page

Today

  • Prepare for code review
    • Metric to present
    • Slides
  • Work on supertable
    • Dreger figure 3 code
      • Run for each of the 5 methods
      • Comparison against matlab code

Blocked:

  • No

Followups:

  • High-F call @11am

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon