Staff Priorities - Fabio

From SCECpedia
Revision as of 21:28, 13 June 2016 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Back from PyCon
  • Receipts
  • Check mesh extraction job on Blue Waters
  • Meeting with JY regarding counting downloads on hypocenter

Today

  • Review AP revised Irikura code
  • Integrate Irikura rupture generator on BBP
  • Run tests to make sure we can reproduce AP's results
  • Run few SO CAL events on BBP server to validate code

Blocked:

  • No

Followups:

  • Allocation call @11am

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Remove GMT dependencies and files
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon