Staff Priorities - Scott

From SCECpedia
Revision as of 17:07, 7 May 2012 by Scottcal (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Generated list of metrics to produce from Kraken runs, emailed to Phil
  • Tested JBSim3d with header files - good curves
  • RWG and AWP halfspace runs completed
  • Use reciprocity to generate Z seismograms with RWG and AWP - not very similar, SGTs didn't look good either
  • Submitted rot Z run, since that looked good in the past
  • Extracted seismograms at TEST site location from RWG and AWP forward runs - not very similar

Today

  • Add CVM-H basin depth in ARs ticket to CyberShake trac
  • Check on rot Z run
  • Check source description in forward run
  • Add merged PSA calculation option to JBSim3d
  • Synthesize seismograms from halfspace runs

Blocked

  • No

Follow-ups

  • With Phil re: storage

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration