Staff Priorities - Fabio

From SCECpedia
Revision as of 16:58, 21 May 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • 11.2.3 validation tests are complete now
  • Final touches on the validation test script
  • Compared 11.2.3 and trunk (using Loma Prieta/URS)
    • Compared several files (output looks identical)
    • Missing ps files (changed validation script to deal with that)
    • Missing xml file in outdata directory (changed run_bbp_2g to copy it)
  • Fixed Trak#73 (wrong units in acc bbp file header)

Today:

  • Go through Trak issues with Phil and prioritize development
  • Setup new laptop
  • Start running first Fling Study scenario (101) on HPCC

Blocked:

  • No

Followups:

  • Meeting with Phil after standup call to discuss priorities