Staff Priorities - Fabio

From SCECpedia
Revision as of 17:30, 23 May 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Investigated SDSU validation run results
    • Replicated Rumi's results using same station list
    • Results not better removing site response and/or using URS's 3D LF option
  • Met with Feng to discuss what NGA models he has/how to integrate with Broadband
  • Integrated Phil's change into trunk
    • Need a workaround for both cases (with and without site response)
  • Python code reworking
    • Enabled $Id$ svn prop for all Python modules

Today:

  • Continue investigating SDSU case
    • Figure out which/how many stations go into the urs_gof program
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other
  • Get ready to run Fling Study scenarios on HPCC when Phil's runs end

Blocked:

  • No

Followups:

  • No