Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Organize Fling Study information on the wiki, create progress table
- Trac #95 (wiki updating)
- Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run
- Results look good
- Ran Fling Study scenario 103 (HPCC)
- Met with Phil and John Yu wrt Fling Study strategy
Today:
- Validate Fling Study scenario 103
- Continue executing Fling scenarios
- Meet John Yu to coordinate data storage, scenario running
- Create Fling Data repo on scec-00 or scec-01
- Move data from Phil's, John's, and Fabio's directories
- Make trunk work both with and without site response
Blocked:
- No
Followups:
- Meeting with John Yu @ TBD
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other