Staff Priorities - Fabio

From SCECpedia
Revision as of 17:17, 31 May 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
    • Monitored Scenario 104 execution
    • Moved data from John's Scenario 107
    • Updated wiki tables
    • Fixed permission issue for Ronnie to update Fling station lists
  • Looked at plot directory in GF distribution

Today:

  • Fling Study
    • Continue to schedule Fling scenarios
    • Shepherd Fling scenario 104 (75% done, should finish today)
    • Validate John's scenario 107 against mine
  • Investigate difference between platform run and Rumi's SDSU's run
  • Make trunk work both with and without site response

Blocked:

  • No

Followups:

  • Talk to Phil about SDSU's validation
  • SDSU's result validation with Rumi

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other