Staff Priorities - Fabio
From SCECpedia
Contents
Yesterday:
- Fling Study
- Finished running Scenarios 113, 114, 115 (weekend), started 116
- John Yu ran Scenarios 108, 119, 120. Running others right now.
- GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8)
- HPCC running small/medium scenarios (max wall time is 2 weeks according to John)
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Investigated SDSU's validation run
- Not able to reproduce Rumi's graph, need to follow up with her
- Found out that BBToolbox generates different graphs depending on how many stations we have
Today:
- Fling Study
- Continue to schedule Fling scenarios
- Move data and validate all completed scenarios
- Follow-up with Rumi wrt her validation run results
- Why different number of stations produce different results
- Find a place in the BB src tree to put the plot files
Blocked:
- No
Followups:
- SDSU's result validation with Rumi
Ongoing:
- Make trunk work both with and without site response
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other