Staff Priorities - Fabio

From SCECpedia
Jump to navigationJump to search

Yesterday:

  • Fling Study
    • Finished running Scenarios 113, 114, 115 (weekend), started 116
    • John Yu ran Scenarios 108, 119, 120. Running others right now.
    • GEOSYS running larger scenarios, finished Scenario 111 today (Mag 7.8)
    • HPCC running small/medium scenarios (max wall time is 2 weeks according to John)
    • Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
  • Investigated SDSU's validation run
    • Not able to reproduce Rumi's graph, need to follow up with her
    • Found out that BBToolbox generates different graphs depending on how many stations we have

Today:

  • Fling Study
    • Continue to schedule Fling scenarios
    • Move data and validate all completed scenarios
  • Follow-up with Rumi wrt her validation run results
    • Why different number of stations produce different results
  • Find a place in the BB src tree to put the plot files

Blocked:

  • No

Followups:

  • SDSU's result validation with Rumi

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other