Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Fling Study
- We are now 37/42
- Scenario 137 validated
- Remaining scenarios running on GEOSYS and HPCC
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Talked to John Yu about setting up Cruise Control
Today:
- Fling Study
- Monitoring running scenarios
- Make trunk pass Unit tests (almost there)
- Make trunk pass Acceptance tests
- Create Cruise Control configuration file (use Kevin's template)
Blocked:
- No
Followups:
- Broadband development with Phil @ TBD
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events and codebases from each other