Staff Priorities - Fabio

From SCECpedia
Revision as of 17:03, 21 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
  • Trac #127: Collected status of broadband resources from John Yu: http://scec.usc.edu/scecpedia/BBP_Development
  • Worked on testing code on trunk, fixed few issues
  • Trac #130: SDSU code was limiting file paths to 99 characters
    • changed to 256 in Fortran code
    • put checks on Python code to exit with proper error message
  • Trac #122: Running BBP with different output directories
    • Same Broadband install can run using separate simulation directory trees
    • Modified reset_acct.py script to support this feature
  • Trac #102/#126 (dup): Moving plots data files out of Greens Function distribution
    • Done and tested, will close the ticket.
  • Trunk passed Unit and Acceptance tests
  • Trunk passed UCSB Landers validation (running 2 more UCSB and all 3 URS cases right now)

Today:

  • Fling Study
    • Monitoring running scenarios
  • Compare full validations from trunk against 11.2.3 (running on Broadband)
  • Write scripts to automate running full validations on HPCC
  • Continue working on the testing framework
  • Work on Cruise Control setup (pending John Yu install)

Blocked:

  • John Yu: Installing Cruise Control
  • HPC: long line of jobs yesterday

Followups:

  • No

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other