Yesterday:
- Fling Study
- Nothing to report today
- We are now 39/42
- Remaining scenarios all running on GEOSYS
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Trac #127: Survey BB Infrastructure: Closed.
- Trac #102/#126 (dup): Move Plots code: Closed.
- Trac #130: File paths on SDSU code: Closed.
- Running full validation tests for URS code (NR, LP completed, LA almost done)
- Compared LP full validation of trunk and 11.2.3 and results are identical
- Running NR full validation on 11.2.3 (didn't save that output)
- Built trunk on HPCC
- PlotMap and PlotGOF didn't work with older matplotlib, created trac issues
- Started work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
Today:
- Fling Study
- Monitoring running scenarios
- Compare URS full validations from trunk against 11.2.3 (LA and NR)
- Continue working on HPCC parallel scripts to run Fling scenarios in half time
- Continue working on the testing framework
- Work on Cruise Control setup (pending John Yu install)
Blocked:
- John Yu: Installing Cruise Control
Followups:
- No
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events and codebases from each other