Staff Priorities - Fabio

From SCECpedia
Revision as of 17:04, 25 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
  • Compared URS full validations of trunk against 11.2.3 (LA and LP).
    • Results identical
  • Running full validation tests for URS code NR
    • Running NR full validation on 11.2.3 (didn't save that output)
  • Trac #101: Implemented unit test to catch mix of spaces and tabs in Python code
    • Current trunk fails that test (new Trac ticked #135)
  • Started work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
    • John's scripts only ran on 1 node
    • Current scripts run on many nodes, but need to capture the output better (fails right now)
  • Joined Broadband science call
    • Lot of progress on the science side
    • Lots of upcoming deadlines

Today:

  • Fling Study
    • Verify scenario 131
    • Monitoring running scenarios
  • Continue working on HPCC parallel scripts to run Fling scenarios in half time
  • Continue working on the testing framework
  • Work on Cruise Control setup (pending John Yu install)

Blocked:

  • John Yu: Installing Cruise Control

Followups:

  • Meeting with Phil to talk about Broadband development priorities @ TBD

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other