Staff Priorities - Fabio
From SCECpedia
Contents
Yesterday:
- Fling Study
- We are now 40/42
- Remaining scenarios all running on GEOSYS
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Running full validation test for URS
- Comparing trunk and 11.2.3 on broadband.usc.edu
- LP and LA passed, waiting for NR to finish running
- Trac #122: Allowing users to specify alternative data root directory using env variable: Done.
- Continued work on adapting run_bbp_parallel scripts to run Fling scenarios in 1 pass
- Problems running on /scratch
- Changed to /tmp and was able to run Fling scenario 101 in 46 min (versus 1h34m using regular scripts)
- Compared new Fling scenario 101 with previous HPCC run (from 11.2.3) and it matches 100%
- Running Fling Scenario 104 using new script (previous runtime was 2.5 days)
Today:
- Fling Study
- Monitoring running scenarios
- Package new running scripts and check them into svn as part of BBP
- Continue working on the testing framework
- Work on Cruise Control setup (pending John Yu install)
Blocked:
- John Yu: Installing Cruise Control
Followups:
- Meeting with Phil to talk about Broadband development priorities @ TBD
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events and codebases from each other