Staff Priorities - Fabio

From SCECpedia
Revision as of 16:45, 29 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
  • Trunk fails UCSB Loma Prieta full validation
    • This issue is documented in Trac issue #77
    • Running UCSB LP full validation with 11.2.3 to confirm results match
  • John Yu installed Cruise Control
  • Met with Phil to talk about Broadband development
    • Discussed recent progress and goals

Today:

  • Fling Study
    • Monitoring running scenarios
  • Package new parallel running scripts and check them into svn as part of BBP
  • Fix Trac issue #77 (UCSB LP validation)
  • Start sketching BBP workflow (component by component with input and output files)
  • Plan separation of GF, validation data, and velocity models
  • Work on Cruise Control setup
  • BBP Science call

Blocked:

  • No

Followups:

  • Broadband tasks for next two weeks with Phil @ TBD
  • Broadband Science call @ 2pm

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events and codebases from each other