Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Fling Study
- We are now 40/42
- Running 118 and 124 on HPCC, using trunk and updated parallel scripts
- Scenario 124 is: 96/178 stations, Scenario 118 is 94/241 stations.
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Trac issue #104: Environment variables select GF and validation: almost done
- Trac issue #82: Separate validation code from Greens Functions: done, testing
Today:
- Fling Study
- Monitoring running scenarios
- Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
- Trac #104: Write sample scripts
- Trac #82: Run more acceptance tests
- Fix Trac issue #77 (UCSB LP validation)
- Continue sketching BBP workflow (component by component with input and output files)
- Trac issue #128: Start work on Cruise Control setup
Blocked:
- No
Followups:
- No
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events from each other