Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Fling Study
- We are now 41/42
- Scenario 124 finished on Saturday, needs to be verified
- Running scenario 118 on HPCC, using trunk and updated parallel scripts
- Scenario 118 is 210/241 stations, should finish on Wednesday
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Fixed Trac issue #77 (UCSB LP validation)
- Met with Phil, discussed design ideas and priorities for Broadband development
- Broadband science call
- Trac issue #104: Environment variables select GF and validation directories: done, testing
- Trac issue #82: Separate validation code from Greens Functions: done, testing
Today:
- Fling Study
- Verify scenario 124, generate tar file, and post data
- Monitoring last running scenario
- Fix issue in GP code where filenames are cut short in site response module
- Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
- Trac #104: Write sample scripts
- Trac #82: Run more acceptance tests
- Trac #84: User selectable Greens Functions
- Continue sketching BBP workflow (component by component with input and output files)
- Trac issue #128: Start work on Cruise Control setup
Blocked:
- No
Followups:
- No
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events from each other